Sunday, February 22, 2009

Ground Floor roof concrete




Work has reached ground floor flat roof concrete level


Picture shows views before roof concreting of Ground Floor

Tuesday, February 17, 2009

Elevation for the house


Picture shows three dimensional elevation for the house under construction

Thursday, February 12, 2009

Sit out beams


Picture shows sit out beams and round columns for sit out

Friday, February 6, 2009

Lintel,flat sunshades and berth slabs







Pictures show lintels,Flat sunshades and berth slabs after concreting.First and second flight of stair is also seen in one of the pictures.After this stage,we have started on brick work above lintel level

Monday, January 26, 2009

Commencement of lintel work


All 24 columns are raised along with brick work upto lintel level and lintel concreting work has started.Picture shows view from east side

Saturday, January 17, 2009

Brick work reaching lintel level


Picture shows brick work for Ground floor reaching lintel level.Lintel level is the top of window and doors level

Wednesday, January 14, 2009

Brick work for Ground Floor


Brick work for Ground Floor started with fixing of doors and window frames,Picture shows work in progress.Door and window frames are being fixed with steel clamps inside concrete on either side of frames for tightly fixing frames to brick work.