Tuesday, November 18, 2008

Red sand filling to raise Ground Level


Red sand filling is being done to raise ground level.After this filling,we will do foundation beam of depth 40 cm.Ultimately this beam level will also be filled and it will be the proposed Ground Level roughly about one feet above from present Ground level in the front side.Picture shows red sand being filled

Thursday, November 6, 2008

Raising of pile columns


All 28 pile columns are being raised upto proposed Ground Level for the plot which is at a height of about 140 cm from the present Ground Level.Picture shows pile columns being raised